Sumdawnna atana Retail Gas Station-a Refueling Solution hrang hrangte
Commercial retail gas station-ah hian fuel pekchhuahna, dahkhawmna enfiahna, fuel transfer, leh station enkawlna atana hmanraw inzawmkhawm (coordinated equipment) a ngai a ni. He solution hian station thar siamna atana hmanrua configuration, station tihzauh, dispenser thlak, leh station tihchangtlunna te a huam a ni.
Retail Station atana thil tul hrang hrang
Fuel Dispensing dik tak a ni
Retail fuel hralhna hi metering mumal tak leh repeatable dispensing performance-ah a innghat a ni. Dispenser thlannaah hian flow rate, meter dikna, nozzle configuration, leh local metrology mamawh hman turte ngaihtuah tur a ni.
Multi-Grade Fueling hmanga siam a ni
Gasoline grade leh diesel engemawzat enkawltu station-ah chuan product path hrang hrang leh nozzle ruahmanna felfai tak siam a ngai a ni. Dispenser configuration hi fuel grade awm zat, fueling position leh nozzle mamawh zat atanga teh a ni.
Fuel Inventory enkawl dan tur ruahmanna siam a ni
Tank level monitoring hian inventory control nan fuel volume, temperature, leh tui-level data a pe a ni. Automatic tank gauging hi a tulna hmunah station management system nen a inzawm thei a ni.
Hlauhawm-Area humhalhna
Fuel dispensing area-ah chuan electrical leh control components hman tur hazardous-area classification hman tur atana remchang a ngai a ni. Explosion-proof configuration leh certification mamawh chu destination market leh hmanraw thlan bik a zirin confirm tur a ni.
Retail Station siam dan tur ruahmanna siam a ni
Fuel Dispenser siam dan tur
Station layout hrang hrang leh fuel-grade combination hrang hrang atan single-, dual-, 4-, 6-, leh 8-nozzle configuration te a awm a. Model hman theihte chuan typical dispensing flow rates 40–50 L/min a support thei a, high-flow configuration erawh a tulna hmunah diesel application atan hman theih a ni thung.
Tank enkawl dan tur
Automatic tank gauging system hian fuel level, temperature leh hnuai tui te a enfiah thei a ni. Static leh dynamic leak monitoring function te chu tank leh monitoring system hman dan angin configure theih a ni.
Lei hnuaia Fuel Transfer a ni
Lei hnuaia fuel transfer system te hi tank awmna, dispenser awmna, pipeline routing, leh site layout te a zirin configure theih a ni. Secondary containment mamawh project hrang hrang tan double-wall piping leh interstitial leak detection te chu tarlan theih a ni.
Station enkawl dan tur
Fuel management system hian dispensing transaction a record thei a, user emaw lirthei emaw hriat theihna a pui thei a, inventory leh shift information a pe thei bawk. Station-a management system awmsa angin POS, IC/RFID, emaw interface dang emaw thlan theih a ni.
Technical lam thil chi hrang hrang
|
Parameter a ni |
A tlangpuiin Specification a awm |
Selection Basis a ni |
|
Dispensing Flow Rate a ni |
40–50 L/min a ni |
Fuel chi hrang hrang leh fueling speed mamawh |
|
High-Flow Diesel a ni |
Model hman tur atan 70–80 L/min a ni |
Sumdawnna atana diesel hmanna tur |
|
Metering dik tak a ni |
Model hman tur atan ±0.2% thleng a ni |
Model leh local metrology mamawh a ni |
|
Nozzle Configuration a awm bawk |
Nozzle pakhat, pahnih, 4, 6, emaw 8 emaw a awm thei |
Fuel grade leh fueling position hrang hrang |
|
Power Supply a awm bawk |
220V / 380V, 50/60Hz a ni a, model hman theih tur a ni |
Tualchhung electric supply a ni |
|
Inbiaktawnna |
RS485 / current loop hmanga system hman tur |
Management leh POS interface te a ni |
|
Nozzle Hnathawh dan |
Automatic shut-off a ni |
Dispenser siam dan tur |
|
Vapor Recovery a ni |
Model hman theih tur tan chuan duhthlan theih a ni |
Tualchhung boruak mamawh te |
|
Explosion-Proof Configuration a ni |
Model- leh market-a innghat |
Hazardous-area leh certification neih ngai te |
Station Type hrang hranga configure dan tur
Gas Station thar siam a ni
Configuration hi a tlangpuiin fuel grade awm zat, dispenser, nozzle, storage tank, fueling position, leh site layout atanga tan a ni.
Station tihzauh a ni
Tank capacity awmsa, pipeline routing, dispenser awmna, electrical supply, leh tuna management system awmsa te chu hmanraw thar dah hmain enfiah hmasak phawt tur a ni.
Dispenser thlak danglam a ni
Replacement project-ah hian dispenser dimension awmsa, nozzle quantity, fuel connection, electrical supply, communication interface, leh metrology mamawh te confirm a ngai a ni.
Station enkawl dan tihchangtlun
Operational control lama innghat project-te chuan fueling system pumpui thlak danglam lovin tank monitoring, transaction recording, user identification, inventory reconciliation, leh POS/system interface-te chu an dah pawimawh ber thei a ni.
FAQ
