Container dahna hmun a ni

Container dahna hmun a ni

Container Filling Station LPQZ hi containerized fueling system a ni a, fuel dahna tank, pumping leh metering system, fuel dispenser, electrical control leh safety components te chu factory-assembled unit pakhata dahkhawmna a ni. Station hi monitoring function thlan bikte nen supply theih a ni a, fuel storage leh dispensing mamawh hrang hrang atan configure theih a ni bawk.

Product chungchang tlangpui

 

Container Filling Station LPQZ hi containerized fueling system a ni a, fuel dahna tank, pumping leh metering system, fuel dispenser, electrical control leh safety components te chu factory-assembled unit pakhata dahkhawmna a ni. Station hi monitoring function thlan bikte nen supply theih a ni a, fuel storage leh dispensing mamawh hrang hrang atan configure theih a ni bawk.

 

Thil siam chhuah dan (Product Structure) a ni

 

Containerized System inzawmkhawmna a ni
Fuel tank, pumping leh metering hmanrua, dispenser, electrical system leh safety components te chu containerized unit chhungah factory-a dahkhawm a ni. Layout hian integrated transport leh installation a support a ni.

Container chhunga thil awmte
Enclosure hian fueling equipment leh electrical components dahna tur hmun a siam a, station layout a zirin access leh ventilation ruahmanna a awm bawk.

Fuel dahkhawmna System
Fuel tank, filter nei oil unloading port, anti-overflow device, blowdown valve leh tank venna component te a tel. Single-wall leh double-wall tank option a awm bawk.

Fueling System hmanga siam a ni
Fuel pump, filter, pipeline, flow meter leh fuel dispenser te a tel. Configuration hi fuel type leh flow rate mamawh angin thlan a ni.

Electrical, Control leh Monitoring lam thil a ni
Station chhungah hian electrical leh control component bulpui te chu dah tel a ni. Optional ATG, leak detection, temperature leh pressure monitoring te a awm bawk.
 

Technical lam thil chi hrang hrang

 

Thil

A sawifiahna

Entawn tlak

LPQZ a ni

Fuel hman tur

Gasoline, Diesel, Kerosene te pawh a awm bawk

Tank chi hrang hrang

Single Wall / Bang pahnih

Tank Capacity a awm thei

Project- bik a ni

Container siam dan tur

Factory-a dahkhawm containerized unit

Voltage a ni

AC 220V / AC 380V a ni

Display System a ni

LCD Display, 775 System hmanga siam a ni

Metering dik tak a ni

0.25%

Flow Rate a ni

5–50 L/min a ni

Flow Meter a ni

Tatsuno Type a ni

Fuel Pump hmanga siam a ni

Tatsuno Type a ni

 

Configuration duhthlan tur a awm

 

Station hi fuel chi hrang hrang, storage capacity, dispensing mamawh leh monitoring mamawh dan azirin configure theih a ni.

Tank a ni

Single-wall emaw double-wall tank emaw a awm

Project-tank bik awm zat

Tank venna atana hman tur components te

Fueling hmanrua te

Fuel dispenser awm zat

Pump chungchang sawifiahna

Metering siam dan tur

Monitoring neih a ni

ATG system hmanga siam a ni

Leak hmuhchhuah a ni

Temperature enfiahna a ni

Pressure enfiahna a ni

Electrical lam thil a ni

AC 220V emaw AC 380V emaw a ni thei

Destination mamawh angin electrical configuration siam a ni

 

Hriselna humhalhna System

 

Leakage laka invenna

Secondary containment leh leakage monitoring mamawh application atan double-wall tank siam leh leak detection chu configure theih a ni.

Overfill venhimna a ni

Storage system hian tank configuration thlan angin anti-overflow device leh high-level protection a keng tel thei a ni.

Emergency Shutdown a nih chuan

Emergency shut-off components te chu fueling system-ah dahin, operating condition pangngai lo tarlan chhunga fuel supply tihtawp theih a ni.

Electric hmanga himna tur

Electrical leh grounding component te chu station design leh installation environment atana thil tul ang zela configure a ni.

 

Thil siam chhuah & Testing tih a ni

 

Tank enfiahna neih a ni
Station-a inzawmkhawm hmain tank welding, sealing leh connection point te enfiah hmasak a ni.

Fueling System Testing neih a ni
Pump, flow meter leh dispenser te hi fuel transfer, metering dik leh dik loh leh dispensing operation te test a ni.

System Integration Testing neih a ni
System assembly zawhah electrical connection, control function, monitoring component leh safety devices te enfiah thin a ni.

Final Inspection neih a ni ang
Containerized station kimchang chu delivery hmain equipment installation, system kalpui dan leh shipment readiness te enfiah thin a ni.

 

Dilna hrang hrang

 

In sakna hmunte
Fueling facility nghet awm lohna hmuna sakna machinery leh hmanrua te tan on-site fuel dahkhawmna leh pekchhuahna a pe.

Mining & Remote atanga hnathawh dan tur
Fuel station infrastructure nghet tak nei lo, independent fuel storage leh lirtheia fuel dahna tur hmun hla tak tak siamna atana hman thin.

Logistics Fleet te a ni
Company- neitu truck, transport vehicle leh fleet operation te tan centralized fuel supply leh internal refueling management a siam thei.

Industrial Facilities te pawh a awm bawk
Factory, warehouse leh industrial site-a hman tur, chhungril lirthei leh hmanrua atana fuel hmanna bik mamawhna hmunah te hman a ni.

 

container filling station 1

 

Configuration a awm bawk

 

container filling station 3

 

Thubuai

 

container filling station 2

 

Delivery Leh Package a awm bawk

 

product-800-851

 

Hriatpuina lehkha

 

Leader Energy Certificate

 

FAQ

 

Q: Quotation dilna tur hian eng information nge mamawh?

A: Buyers te chuan fuel type, storage capacity mamawh, dispensing mamawh, power supply standard, application awmna hmun leh configuration atana special function mamawh eng pawh an pe tur a ni.

Q: Container Filling Station hi unit kimchang anga pek chhuah a ni em?

A: Ni e. Station hi thawn chhuah hmain an inzawm khawm a, an test a, hei hian fueling hmanrua bulpui chu integrated containerized system angin an rawn thawn thei a ni.

Q: Installation hmain eng inbuatsaihna nge mamawh?

A: Installation hmunah hian foundation tha tak, power supply mamawh leh equipment configuration angin fuel connection tul tak tak a awm tur a ni.

Q: Shipment nen hian eng document nge awm?

A: Project mamawh angin technical drawing, inspection record, operation manual leh export document te pek theih a ni.

Q: Station hi electrical standard hrang hrang hmanga supply theih a ni em?

A: Ni e. Voltage leh electrical configuration te chu destination ram mamawh leh project specification angin siamrem theih a ni.

Q: Container Filling Station customized siamna atana lead time hman dan tlangpui chu engzat nge ni?

A: Lead time hi tank capacity, equipment configuration, customization mamawh leh production schedule ah a innghat a ni. A tawp bera delivery hun tur chu technical review hnuah confirm a ni.

Q: Engtin nge station hi an package leh an thawn chhuah?

A: Station hi phurh hmain venhim a ni a, integrated containerized unit angin thawn chhuah a ni. Lifting ruahmanna leh shipping document te chu logistics mamawh angin siam theih a ni.

hot tags .: container filling station, China container filling station siamtu, supplier, factory

Inquiry thawn rawh .

(0/10)

clearall