
Fuel pekna hmun a ni
Fuel Dispensing Station hian fuel dahkhawmna, pumping, dispensing, leh safety system te chu modular unit-ah a dah khawm a ni. Hmun hla tak tak, fleet yard leh industrial application atana duan a nih avangin diesel, gasoline, biodiesel leh fuel dang inmil tak tak a support a, hei hian installation tha tak, fuel supply rintlak leh deployment awlsam tak a siam thei a ni.
Product chungchang tlangpui
Fuel Dispensing Station hian fuel dahkhawmna, pumping, dispensing, leh safety system te chu modular unit-ah a dah khawm a ni. Hmun hla tak tak, fleet yard leh industrial application atana duan a nih avangin diesel, gasoline, biodiesel leh fuel dang inmil tak tak a support a, hei hian installation tha tak, fuel supply rintlak leh deployment awlsam tak a siam thei a ni.
Technical lam thil chi hrang hrang
|
Technical Parameter a ni |
Standard Configuration / Thil thlan theih a ni |
|
Tank Capacity hmingtha tak a ni |
Litre 10,000–60,000 vel a ni a; custom capacity Liter 100,000 thleng a awm thei |
|
Tank siam a ni |
Double-wall, cylindrical carbon steel tank a ni a, a chhungah anti-corrosion coating a awm bawk |
|
Compartment duhthlan tur a awm |
Single-compartment emaw multi-compartment configuration emaw, chamber hrang hrang 2–4 awmna |
|
Dispenser atanga tui luang chhuak zat |
Hnathawh dan pangngai: 50–80 LPM; Hnathawh rit tak: 120–500 LPM |
|
Pumping System hmanga siam a ni |
Heavy-duty positive displacement vane pump emaw gear pump emaw, integrated bypass valve nei emaw a ni |
|
Metering dik tak a ni |
High-precision piston emaw axial meter emaw hmanga ±0.2% thlenga dikna |
|
Power Supply a awm bawk |
380V/415V, 3-Phase, 50Hz/60Hz hmanga siam a ni a; solar-powered leh generator-backed option a awm bawk |
|
Operating Temperature a ni |
-40℃atanga +55℃thleng ; HVAC leh thermal insulation package duhthlan tur a awm bawk |
|
Container Dimension hrang hrangte |
Standard 20ft container: L 6.0m × W 2.4m × H 2.6m vel a ni a; 40ft ISO container duhthlan tur a awm bawk |
Thil pawimawh tak tak
Turnkey Plug-leh-Play Design:Factory-assemble leh test a ni a, on-site installation hna tihtlem a ni. Station hi a tlangpuiin concrete foundation buatsaih saah dah theih a ni a, utilities mamawh nen pawh inzawm theih a ni.
Double-Wall Containment a awm a:Double-wall tank hian containment layer dang a pe a, optional emaw integrated leak monitoring configuration te chuan spill leh leakage control tihchangtlun nan a pui thei bawk.
Modular Multi-Compartment siam dan tur chu:Fuel product hrang hrang dahna compartment hrang hrang a support a, diesel leh gasoline te pawh a support bawk. DEF/AdBlue ang chi product hrang hrangte tana configuration dang pawh project mamawh angin a awm bawk.
ISO Container hmanga siam dan: 1.1.20ft emaw 40ft emaw containerized configuration-ah a awm a, hei hi lirtheia kal awlsamna tur, dahna tur, leh hmun danga sawn theihna tur a ni. Container certification leh transportation mamawh te chu destination market a zirin configure theih a ni.
Dilna hrang hrang
Kan Fuel Dispensing Station hi fuel dahkhawm leh pekchhuahna rintlak, him, leh independent tak mamawhna atana siam a ni a, chung zingah chuan:
Mining & Mineral zawn chhuahna: 1.1.Hmun hla tak atanga mining hnathawhna hmuna haul truck, excavator, generator, leh hmanraw rit dangte tan on-site refueling.
Sumdawnna lama Transport & Logistics lam: 1.1.Trucking company, delivery fleet, bus, leh sumdawnna lama lirthei kalpui thin dangte tan Depot-based refueling.
In sakna & Infrastructure lam: 1.1.Highway, bridge, dam, railway, leh sakna project lian-scale dangte tana fuel dahkhawm leh pekchhuahna (flexible fuel storage and dispensing) a ni.
Agriculture, Forestry & Hmun hla tak atanga hnathawh dan:Tractor, harvester, forestry hmanrua, generator, leh machinery te tan on-site fueling, hmun lian emaw, hmun hla tak emaw atanga hnathawkte tan.
A Hnathawh Dan
Fuel Dispensing Station hian installation atanga nitin hnathawh thlenga kalphung awlsam, inzawmkhawm a zawm a:
Site dah dan & Inzawmna:Unit hi foundation buatsaih saah dah a ni a, power supply mamawh nen a inzawm a ni. Site mamawh angin optional solar emaw generator system te chu inzawmkhawm theih a ni.
Fuel phurh zat:Fuel hi dedicated filling port hmanga pek chhuah a ni a, filling leh overfill protection components dik tak hmanga thuam a ni a, hei hian tank loading him tak a pui thei a ni.
User hmanga finfiahna:Fuel management system dahna hmunah chuan phalna nei operator te chuan RFID card emaw PIN code emaw ang chi supported identification method hmangin dispensing function te chu an lut thei a ni.
Fuel pek chhuah dan:Fuel thlan chu pump, meter, hose, leh automatic shut-off nozzle hmangin transfer a ni a, chu chuan controlled leh measured fuel delivery a pe thei a ni.
Data enkawl dan: 1.1.Fuel dispensing transaction leh inventory information te chu fuel management system hmangin record theih a ni a, support a nihna hmunah monitoring emaw management platform inmil takah a thawn thei bawk.
Site dahna & Inzawmna
↓
Fuel Loading a ni
↓
User Authentication tih hi a ni
↓
Fuel pek chhuah dan
↓
Data enkawl dan leh enkawl dan
A bulpui ber berte
Fuel station tin hi rintlak, him taka hman theih turin thil leh component chhe thei lo hmanga siam a ni:
Primary Storage Tank ah hian a awm a:Engineering standard anga siam double-wall carbon steel tank, manhole, calibration data, vents, leh protective internal coatings te a awm a ni.
Dispenser leh Meter te chu:Commercial unit-ah LCD display, high-accuracy positive displacement meter, heavy-duty hose, leh automatic shut{2}}off nozzle te a awm.
Pumping leh Filtration te chu: 1.1.Transfer pump fuel type leh flow rate nena inmil, particulate leh water-separation filter nena paired, hmanrua venhimna leh fuel thianghlimna vawng reng tur.
Automation & Control hmanga hnathawh dan:Central system hmanga pump hnathawh dan, safety interlock, emergency stop, leh fuel management communication te enkawltu, site condition anga configure a ni.
Venting & Safety te chu: 1.1.Pressure-vacuum relief valve, emergency shut-off valve, overfill venhimna, leh hnathawhna lama himna tur grounding ruahmanna te.

Configuration a awm bawk

Delivery Leh Package a awm bawk

Hriatpuina lehkha

fAQ tih hi a ni
Q: Eng site buatsaih nge ngai?
A: Level, reinforced concrete foundation, fully loaded station thlawp thei tura duan a ngai tlangpui a, grounding tha tak leh electrical leh fuel connection tul te nen. Station hi modular aboveground system anga duan a nih avangin lei hnuaia tank zau tak dah leh civil sakna chu a tlangpuiin tihtlem theih a ni.
Q: Station hi hmun hla takah emaw, power tlakchham laiin emaw a thawk thei em?
A: Ni e. Standard configuration-ah chuan 380V/415V three-phase power hman theih a ni a, optional solar power, battery system, emaw diesel generator connection te chu project mamawh angin a inzawm khawm thei bawk. Heng option te hian grid electric hman theih lohna emaw rintlak lohna hmun hla tak takah primary emaw backup power emaw a pe thei a ni.
Q: Fuel management system hi ERP emaw fleet management software awmsa nen a inzawm thei em?
A: Fuel management system hi management platform inmil tak nena inzawm theih turin configure theih a ni. Control system thlan dan azirin transaction, inventory leh user information te chu communication interface emaw API awmsa hmangin inthleng theih a ni. Integration mamawh bikte chu customer ERP emaw fleet management software emaw angin confirm tur a ni.
Q: Flow meter te hi engzat nge calibration an mamawh?
A: Flow meter te hi siamtu rawtna, hnathawh dan, leh tualchhung dan hman tur angin enfiah leh finfiah tur a ni. Calibration frequency hi meter chi hrang hrang, fuel hman dan, dispensing volume, leh dan anga metrology mamawh dan azirin a danglam thei. Technician thiam tak takte chuan calibration system ruat sa hmangin calibration an ti thei a ni.
Q: Local permit neih a ngai em?
A: Permit mamawh hi ram, bial, fuel chi, installation hmun, leh storage capacity a zirin a inang lo. Project a zirin phalna peknaah hian environment, zoning, kangmei-safety, electrical, leh fuel-storage permit te pawh a tel thei. Local approval process pui turin technical drawing, datasheet, leh certification document awmsa te kan pe thei a ni.
Q: Replacement parts hi awlsam taka hmuh theih a ni em?
A: Station configuration leh component thlan bik angin replacement parts supply theih a ni. A tul angin hmun pangngai, hose, nozzle, filter, meter, pump, valve, leh electrical component te pawh pek theih a ni. Hun rei tak-site maintenance support mamawh customer te tan pawh recommended spare-parts package siam theih a ni bawk.
Q: Engtin nge storage tank hi enfiah leh enkawl a nih?
A: Storage tank-ah hian access manhole emaw, inspection point dang ruat bik emaw dah a ni a, chu chu tihfai, enfiah leh enkawlna tur a ni. Mi thiamte chuan tank chhung, protective coating, valve, connection leh component dangte chu a hun hunah an enfiah thei a, a tul hunah chuan accumulated residue te chu an paih chhuak thei bawk. Inspection leh maintenance-ah chuan dan hman tur leh siamtuin a rawt dante zawm tur a ni.
hot tags .: fuel dispensing station, China fuel dispensing station siamtu, supplier, factory
Inquiry thawn rawh .





